Cloud Migration in Oldenburg – reliable from Hamburg
Oldenburg is an energy and insurance hub (EWE, OFD) – reliable industries that are gradually modernizing their cloud strategy.
We plan and implement cloud migrations without downtime. Lift-and-Shift, Re-Platforming, or Cloud-Native Refactoring—tailored to the specific starting situation.
For clients in Oldenburg, this means concretely: initial consultation within 48 hours, transparent effort estimation, regular on-site meetings as needed, and a dedicated engineering partner throughout the entire project duration. No hidden subcontracting, no junior consultant hiding places.
Industries with cloud demand in Oldenburg
Energy Supply
EWE – Energy data platforms and smart grid solutions that require cloud scaling.
Insurance
Public Insurance Oldenburg – regulatory-sensitive workloads in GDPR-compliant cloud.
Agritech
Big Dutchman, stall equipment supplier – IoT data from animal husbandry as a cloud use case.
Cloud Migration – for companies in Oldenburg
Out of the data center, into the cloud — zero downtime, zero data loss. We migrate your systems strategically and keep them running afterward.
Full service descriptionIn numbers: A typical cloud migration for medium-sized businesses with 10-30 servers lasts 4-12 weeks, costs between 30,000-150,000 EUR, and saves between 20% and 40% on infrastructure costs after 12-18 months. The most common AWS region for companies from Oldenburg is eu-central-1 (Frankfurt) – GDPR-compliant and with the lowest latency for Northern Germany.
Further sources: AWS Migration Whitepaper for official migration strategies, BSI C5 Catalog for DACH compliance.
Blog posts on this topic
Cloud Migration: 5 Critical Mistakes You Must Avoid
A cloud migration can transform your business, or turn into a nightmare. We share the most common pitfalls from over 50 migration projects.
Multi-Cloud vs. Single-Cloud: A Strategic Decision Guide
Multi-cloud is considered best practice, but is it really? We examine the costs, complexity, and real benefits of both approaches.
AWS RDS Aurora: When Switching from Standard MySQL Is Worth It
Aurora promises up to 5x better performance than standard MySQL. But when does the premium actually pay off? An honest analysis from our project exper...
Frequently asked questions about Cloud Migration in Oldenburg
For a typical medium-sized enterprise with 10-30 servers, we estimate a project duration of 4-12 weeks. Lift-and-Shift migrations can be accomplished in 4-6 weeks, while Re-Platforming or Cloud-Native Refactoring usually takes 8-12 weeks. Before each project, we conduct a 1-2 day inventory assessment to provide a reliable time estimate.
For companies from Oldenburg and all of northern Germany, we typically recommend eu-central-1 (Frankfurt) as the primary region. It is GDPR-compliant, has the lowest latency for DACH, and supports all relevant AWS services. For particularly sovereignty-sensitive workloads (authorities, healthcare), we consider eu-central-2 (Zurich) or the AWS European Sovereign Cloud (available from 2026).
The migration costs for medium-sized businesses typically range between EUR 30,000 and EUR 150,000 – highly dependent on complexity, the proportion of re-platforming, and the number of workloads. Ongoing cloud costs can vary considerably; more important than the list price are FinOps measures (Reserved Instances, Right-Sizing, Auto-Scaling), which typically save 20-40% of cloud costs.
Cloud Migration in other Northern German cities
Written and technically supervised by Joachim Hart-Fernandez, Managing Director of devRocks GmbH. 25+ years of engineering experience in cloud infrastructure, Kubernetes, DevOps, and application development for the German Mittelstand.
Let's work together.
Whether it's a new project, technical consulting, or modernizing existing systems, we look forward to hearing from you.
Get in Touch